§ 805. Service Limitations.  


Latest version.
  • 1. 
    Single-phase service for lighting will not be supplied where the connected load to be served exceeds 25 KVA of capacity, unless previous arrangements have been made with the company. The customer must arrange the wiring of loads in excess of this amount to receive polyphase service.
    2. 
    The customer shall at all times take and use energy in such a manner that it will be taken equally between phases. Should this not be possible, and the unbalancing equals or exceeds 10% of the lesser phase, then the charge therefor shall be computed on the assumption that the energy taken from each phase is equal to the amount taken from the greater phase.
Ord. 1211, 9/2/2015