The Borough reserves the right to determine, by test at a time
of normal load or by permanently installed instruments, the power
factor of the consumer's load at the point where the electric
energy is metered, and if the average monthly power factor is less
than 85%, the Borough may, upon 60 days' notice to the consumer, compute
that consumer's bill for electric service by multiplying the
KWH metered by the following constants.
Ord. 425, 6/7/1950, Art. XIX, § 2; as added by
Ord. 447, 6/6/1951, § 2